根據(jù)道路的原有結(jié)構(gòu),冷再生機(jī)的施工方案也不同,今天就給大家介紹一下:
According to the original structure of the road, the construction scheme of the cold regenerator is also different. Let's introduce it to you today:
在利用水泥進(jìn)行就地冷再生時(shí),外加料主要是水泥,水泥的通常用量按重量計(jì)在2%-5%之間比較合適。如果水泥的用量過(guò)多,容易使再生層變脆。為了獲得良好的壓實(shí)效果,同時(shí)還要加入適量的水。水
When using cement for in-situ cold regeneration, the additive is mainly cement, and the usual dosage of cement is between 2% - 5% by weight. If the amount of cement is too much, it is easy to make the recycled layer brittle. In order to obtain good compaction effect, an appropriate amount of water should be added at the same time. water
泥的加入方法有兩種!一種是利用人工或?qū)S脵C(jī)械將水泥預(yù)先撒布在需要再生的路面上。這時(shí)水的加入方法,是通過(guò)再生機(jī)上所配備的微機(jī)控制系統(tǒng)從跟班作業(yè)的運(yùn)水車(chē)內(nèi)輸送到再生機(jī)的拌和倉(cāng)中。
There are two ways to add mud! One is to use manual or special machinery to pre distribute cement on the road surface that needs regeneration. At this time, the water is added through the microcomputer control system equipped on the regenerator, which is transported from the water truck of the attendant to the mixing bin of the regenerator.
另一種方法是采用水泥稀漿攪拌輸送車(chē),將需要添加的水泥和水?dāng)嚢璩伤嘞{,再通過(guò)再生機(jī)上的控制系統(tǒng)將其輸送到再生機(jī)的拌和倉(cāng)中。
Another method is to use the cement slurry mixing truck to mix the cement and water to be added into cement slurry, and then transport it to the mixing bin of the regenerator through the control system on the regenerator.
上述兩種加入方法各有利弊,預(yù)撒水泥法工藝簡(jiǎn)單, 但在施工過(guò)程中容易產(chǎn)生灰塵,不過(guò)這種方法有一個(gè)很大的優(yōu)點(diǎn),就是在控制用量方面非常方便。
The above two addition methods have their own advantages and disadvantages. The pre cement method is simple, but it is easy to produce dust in the construction process. However, this method has a great advantage, which is very convenient in controlling the dosage.
因?yàn)樵谑┕ぶ?ldquo; 再生機(jī)要分幾個(gè)工作行程才能完成一個(gè)作業(yè)段內(nèi)整幅路面的銑刨,而再生層的碾壓要等到整個(gè)作業(yè)段全部施工工序完成之后才能進(jìn)行
Because in the construction, the "recycling machine" can complete the milling of the whole pavement in an operation section only by dividing into several working strokes, and the rolling of the recycling layer can only be carried out after the completion of all construction processes in the whole operation section
這就形成先銑刨的路面和后銑刨的路面到碾壓時(shí)所等待的時(shí)間間隔相差很多,在較熱或較干燥的氣候里,隨著時(shí)間的拖延,先銑刨的路面水分蒸發(fā)得較多,而后銑刨的路面水分蒸發(fā)得較少。
This results in a great difference in the waiting time interval between the first milled pavement and the later milled pavement to rolling. In a hot or dry climate, with the delay of time, the water evaporation of the first milled pavement is more, and the water evaporation of the later milled pavement is less.
  • 上一條:冷再生機(jī)在國(guó)內(nèi)的發(fā)展?fàn)顩r是什么樣的?
  • 下一條:冷再生機(jī)施工有沒(méi)有地域和限制呢?
  • 两个女人互添下身高潮| 自己撅起来乖乖挨c烂h| 亚洲色WWW永久网站| 师尊被掐着腰做到潮喷纯肉gb| 国产98在线 | 欧美| 2022最新韩国理伦片在线观看| 大肉蒂被嘬的好爽h娇门吟| 日韩人妻无码专区一本二本| 翁吻乳婷婷小玲21章小说| 小莹客厅激情1章至50章视频| 日本工囗漫画h无遮挡全彩| 亚洲日韩一区二区三区四区高清| 福利cosplayh裸体の福利| 大香线蕉伊人久久爱| 高h秘书不许穿内裤1v1| 激烈18禁高潮视频免费| 香港特级三a毛片免费观看| 男女做爰猛烈吃奶摸视频| 五月丁香综合激情六月久久| 亚洲欧美自偷自拍另类视| 内射人妻无码色av天堂| 亚洲av永久无码精品水牛影视| 精产国品一二三卡| 中文无码av人妻久久系列| 国产美女裸体无遮挡免费视频| 公翁大龟挺进秀婷小说| 欧美放荡办公室videos按摩| 变成黑皮辣妹和朋友| 蜜臀av色欲a片无码精品一区| 国内少妇偷人精品视频免费| 国内揄拍国内精品人妻试看| 中文字幕无码精品三级在线电影| 亚洲中文字幕乱码熟女在线| 色婷婷av一区二区三区| 成人无码欧美大尺度视频| 免费a级毛片无码a∨免费软件| 坐公交车被c了2个小时| 日韩在线观看高清视频| 99久热在线精品视频观看| 国产精品99无码一区二蜜桃| 特黄特黄的欧美大片|