歡迎訪問山東途暢路橋工程有限公司網(wǎng)站!

冷再生機(jī)租賃,水泥撒布車出租

施工租賃熱線

18264104888

您現(xiàn)在所在的位置 :首頁 - 新聞中心 > 公司新聞
公司新聞

粉料撒布車與冷再生拌和機(jī)在水泥穩(wěn)定土施工的配合
來源:http://www.xintangt.com/ 日期:2023-12-12

施工操作要點(diǎn)

Key points of construction operation

(1)測量放樣。

(1) Measurement and layout.

測設(shè)中樁,直線段每20m設(shè)一樁,平曲線段每10m設(shè)一樁,并在兩側(cè)路肩邊緣外設(shè)指示樁,見圖2。在指示樁上用明顯標(biāo)記標(biāo)出水泥土邊緣的虛鋪高度。

Set up center stakes, with one stake every 20m for straight sections and one stake every 10m for flat curved sections, and set up indicator stakes outside the edges of the road shoulders on both sides, as shown in Figure 2. Clearly mark the virtual laying height of the cement soil edge on the indicating pile.

(2)土方攤鋪。

(2) Earthwork paving.

原地面、水泥攪拌樁、砂礫換填驗(yàn)收合格后,恢復(fù)中樁和兩側(cè)邊樁,檢測基底高程,在基底上用石灰線畫出中線、邊線和布土方格(圖3)。根據(jù)實(shí)測虛鋪系數(shù)計(jì)算虛鋪厚度,壓實(shí)厚度按照20cm控制。根據(jù)運(yùn)土車大小,計(jì)算布土方格尺寸。

After passing the acceptance inspection of the original ground, cement mixing piles, and gravel replacement, restore the middle pile and the side piles on both sides, check the elevation of the foundation, and draw the center line, edge line, and soil distribution grid on the foundation with a lime line (Figure 3). Calculate the virtual paving thickness based on the measured virtual paving coefficient, and control the compacted thickness at 20cm. Calculate the size of the soil distribution grid based on the size of the bulldozer.

20200708054132510.jpg

(3)整平。

(3) Leveling.

推土機(jī)粗平后做出標(biāo)高控制點(diǎn),然后用平地機(jī)精平,整理出路拱和橫坡,見圖4。整平后要及時檢測素土的含水量,按比含水量高出2%控制。隨后檢測土的含水量是否均勻并符合要求,合格后進(jìn)入下道工序。當(dāng)含水量過低時,采用水車補(bǔ)水調(diào)整。當(dāng)含水量大時,需翻開晾曬。

After rough leveling with a bulldozer, elevation control points are made, and then a leveling machine is used to level the arch and cross slope, as shown in Figure 4. After leveling, the moisture content of the soil should be tested in a timely manner, and controlled to be 2% higher than the optimal moisture content. Subsequently, check if the moisture content of the soil is uniform and meets the requirements. After passing the test, proceed to the next process. When the water content is too low, use a water truck to replenish water for adjustment. When the moisture content is high, it needs to be opened and dried.

(4)撒布水泥。

(4) Spread cement.

采用粉料撒布車進(jìn)行水泥撒布,見圖5。撒布前需要根據(jù)水泥劑量計(jì)算出每平方米的水泥撒布量,然后只需駕駛員在車輛控制器中輸入每平方米的水泥撒布量和撒布寬度即可。輸入后,車輛控制系統(tǒng)自動計(jì)算出相關(guān)參數(shù)并開始均勻撒布。

Use a powder spreader to spread cement, as shown in Figure 5. Before spreading, the cement spreading amount per square meter needs to be calculated based on the cement dosage, and then the driver only needs to input the cement spreading amount and spreading width per square meter in the vehicle controller. After input, the vehicle control system automatically calculates the relevant parameters and begins to evenly distribute.

(5)拌和。

(5) Mixing.

水泥撒布完成后采用冷再生拌和機(jī)拌和,見圖6。從兩側(cè)向中間方向進(jìn)行拌和,拌和速度為1~3.3km/h,拌和次數(shù)不少于1次,直到翻拌均勻?yàn)橹?。翻拌過程中,應(yīng)安排人隨時檢查翻拌深度是否滿足要求。翻拌完成后檢查含水量,如果含水量滿足要求,混合料色澤均勻一致,沒有灰條、灰團(tuán)和花面,沒有粗細(xì)顆?!案C或帶”就算拌和合格。同時采用EDTA滴定法快速測定水泥劑量。若水泥量不足,應(yīng)補(bǔ)撒水泥,重新滴定直至水泥劑量滿足大于等于4%的要求,然后重新拌和至符合要求。

After the cement distribution is completed, it is mixed using a cold regeneration mixer, as shown in Figure 6. Mix from both sides to the middle direction, with a mixing speed of 1-3.3km/h and a mixing frequency of no less than 1 time until it is evenly mixed. During the mixing process, personnel should be arranged to check whether the mixing depth meets the requirements at any time. After the mixing is completed, check the moisture content. If the moisture content meets the requirements, the color of the mixture is uniform and consistent, without any gray bars, clumps, or spots, and without coarse or fine particles, it is considered qualified for mixing. Simultaneously, the EDTA titration method is used to quickly determine the dosage of cement. If the cement content is insufficient, cement should be added and re titrated until the cement dosage meets the requirement of 4% or more, and then re mixed until it meets the requirements.

拌和過程中,及時檢查混合料的含水量。含水量宜略大于含水量1~2個百分點(diǎn)。如果混合料的含水量不足,利用灑水車灑水潤濕。

During the mixing process, check the moisture content of the mixture in a timely manner. The moisture content should be slightly higher than the optimal moisture content by 1-2 percentage points. If the moisture content of the mixture is insufficient, use a sprinkler truck to wet it.

(6)壓實(shí)。

(6) Compaction.

水泥土拌和均勻后,用壓路機(jī)立即在基面上快速碾壓一遍,以暴露潛在的不平整,見圖7。然后再用平地機(jī)精平一次。每次整平都按照精平要求進(jìn)行。需特別注意接縫處的整平,使接縫順適平整。

After mixing the cement and soil evenly, use a roller to quickly roll it over the base surface to expose potential unevenness, as shown in Figure 7. Then use a leveling machine to level it again. Each leveling is carried out according to the precision leveling requirements. Special attention should be paid to leveling the joints to make them smooth and comfortable.

整型后,用壓路機(jī)(22t)在填筑全寬內(nèi)相鄰交錯排列,由兩側(cè)向中線縱向進(jìn)退式碾壓。碾壓時,重疊1/2輪寬,后輪超過邊線。在頭兩遍時壓路機(jī)的碾壓速度采用1.5~1.7km/h,以后采用2.0~2.5km/h。

After shaping, use a roller (22t) to arrange adjacent staggered layers within the full width of the filling, and roll longitudinally from both sides towards the centerline. When rolling, overlap by 1/2 of the wheel width, and the rear wheels exceed the edge line. In the first two passes, the rolling speed of the roller is 1.5~1.7km/h, and in the future, it is 2.0~2.5km/h.

碾壓原則為先兩側(cè)后中間,先慢后快、靜壓、弱振、強(qiáng)振并檢測高程和壓實(shí)度、第四遍強(qiáng)振并檢測高程和壓實(shí)度,直到壓實(shí)度符合設(shè)計(jì)要求,靜壓消除表面輪跡印。

The rolling principle is to start from both sides and then the middle, slow first and then fast. The first pass is static pressure, the second pass is weak vibration, the third pass is strong vibration and the elevation and compaction degree are checked. The fourth pass is strong vibration and the elevation and compaction degree are checked until the compaction degree meets the design requirements. Finally, the surface wheel marks are eliminated by static pressure.

(7)試驗(yàn)檢測。

(7) Experimental testing.

水泥穩(wěn)定土碾壓完成后,先進(jìn)行自檢,見圖8。自檢合格后,報(bào)總監(jiān)辦及中心實(shí)驗(yàn)室檢測。經(jīng)檢測合格后方可進(jìn)行下一步工序施工。

After the compaction of cement stabilized soil is completed, self inspection should be carried out first, as shown in Figure 8. After passing the self inspection, report to the Director's Office and the central laboratory for testing. Only after passing the inspection can the next step of construction be carried out.

本文由冷再生機(jī)租賃整理發(fā)布,您是不是對這些內(nèi)容有所了解了呢?更多的內(nèi)容請點(diǎn)擊:http://www.xintangt.com我們會有更多精彩內(nèi)容等你查看

This article is organized and published by Cold Recycling Machine Rental. Do you have any understanding of these contents? For more information, please click on: http://www.xintangt.com We will have more exciting content waiting for you to view

  • 上一條:粉料撒布車的除塵系統(tǒng)使用
  • 下一條:路面冷再生機(jī)的組成及工作原理
  • 永久免费无码AV在线网站| 国产精品v欧美精品v日韩精品| gogo人体gogo西西大尺度高清| 亚洲精品无码高潮喷水a片软| 国产成人AV片无码免费| free嫩白18sex性hd处| 小少妇性开放xxxxxhd| 少妇被又大又粗又爽毛片久久黑人| 免费无码中文字幕a级毛片| 一区二国产好的精华| 欧美成人精品一区二区免费| 美女露?0的奶头无挡挡| 新岳乱合集500系列| 散装肉脯(h)海棠书屋| 92午夜少妇极品福利无码电影| 久久精品日日躁夜夜躁欧美| 久久久精品人妻一区二区三区四| 亚洲国产精华液2020| 特发性震颤是什么病| 婆岳同床双飞呻吟艳妇无边| 偷拍真实夫妇作爱视频| 大黑大巴大战欧洲美女图片| 久久精品人妻少妇一区二区三区| 亚洲va韩国va欧美va| 性饥渴的女邻居hd| 久久人人爽人人爽人人av东京热| 亚洲欧美一区二区三区| 欧美性做爰片免费视频看不忠| 怡红院a∨人人爰人人爽| 老张和老李互相换女h| 大战丰满人妻50p| 久久久久国产精品嫩草影院| 丰满人妻被公侵犯完整版| 一本色道久久爱久久综合网| 免费无遮挡无码永久在线观看视频| 张柏芝用嘴给陈冠希高潮| 又大又紧又爽水又多18p| 四虎影视在线影院在线观看| 亚洲精品国产偷五月天丁香| 18禁黄久久久aaa片| 草色噜噜噜av在线观看香蕉|