公司新聞

冷再生基層工程質(zhì)量檢測(cè)及注意事項(xiàng)
來源:http://www.xintangt.com/ 日期:2024-04-11

1、舊路的預(yù)處治

1. Pre treatment of old roads

要求在設(shè)計(jì)和施工時(shí),根據(jù)各路段的不同特點(diǎn),進(jìn)行詳細(xì)的調(diào)查和方案調(diào)整。

Detailed investigation and scheme adjustment are required during design and construction based on the different characteristics of each road section.

20220315030150395.jpg

2、再生深度

2. Regenerative depth

再生后層面的厚度主要取決于再生深度。再生深度太淺,會(huì)使再生層的厚度小于設(shè)計(jì)要求的厚度,層厚是決定路面結(jié)構(gòu)穩(wěn)定性的重要指標(biāo)。因此,必須隨機(jī)鉆孔取樣檢查。如果檢測(cè)值偏離設(shè)計(jì)值,應(yīng)及時(shí)調(diào)整冷再生機(jī)深度,使其達(dá)到設(shè)計(jì)深度要求。

The thickness of the regenerated layer mainly depends on the depth of regeneration. If the regeneration depth is too shallow, it will make the thickness of the regeneration layer less than the design requirement, and the layer thickness is an important indicator that determines the stability of the pavement structure. Therefore, it is necessary to randomly drill holes for sampling and inspection. If the detection value deviates from the design value, the depth of the cold regeneration machine should be adjusted in a timely manner to meet the design depth requirements.

3、接縫

3. Seams

為了保證全幅路面的再生施工,相鄰兩個(gè)再生幅面的搭接寬度設(shè)為20cm.對(duì)預(yù)先標(biāo)記在路面上的銑刨標(biāo)示線進(jìn)行檢查,所有后續(xù)再生幅面的寬度至少應(yīng)比銑刨轂的寬度窄15cm.若偏差超過10cm,則應(yīng)立即倒退至開始出現(xiàn)偏差的地方,然后沿著正確的銑刨標(biāo)示線重新施工。施工中,應(yīng)盡量減少停機(jī)現(xiàn)象??v向接縫的位置應(yīng)盡量避開行車道上車輛行駛的輪跡。

In order to ensure the regeneration construction of the entire road surface, the overlapping width of two adjacent regeneration surfaces is set to 20cm. The milling marking line pre marked on the road surface should be checked, and the width of all subsequent regeneration surfaces should be at least 15cm narrower than the width of the milling hub. If the deviation exceeds 10cm, it should be immediately reversed to the point where the deviation began, and then reconstructed along the correct milling marking line. During construction, downtime should be minimized as much as possible. The position of the longitudinal joint should try to avoid the wheel tracks of vehicles on the lane as much as possible.

4、路面標(biāo)高

4. Road surface elevation

現(xiàn)場(chǎng)冷再生層作為路面基層時(shí),路面標(biāo)高一般比舊路提高8~10cm,作為路面底基層時(shí),路面標(biāo)高一般比舊路提高23~28cm,由此引起的主要問題有:與結(jié)構(gòu)物的銜接問題;與舊路接頭的接順問題;過村路段的排水問題。

When the on-site cold recycled layer is used as the base layer of the road surface, the road surface elevation is generally 8-10cm higher than the old road. When it is used as the sub base layer of the road surface, the road surface elevation is generally 23-28cm higher than the old road. The main problems caused by this include: connection with the structure; Connection issues with old road joints; Drainage issues on the village road section.

  • 上一條:水泥撒布機(jī)在施工中的細(xì)節(jié)
  • 下一條:銑刨機(jī)租賃的分類和其他應(yīng)用場(chǎng)合
  • 相關(guān)新聞:

    久久成人国产精品麻豆| 特黄a又粗又大又黄又爽a片| 中文字幕在线播放| 亚洲熟妇丰满多毛xxxx| 将军餐桌下顶撞h厨房play| 亚洲av无码一区二区二三区入口| 同性男在啪的动漫网站| 性生生活20分钟免费| 少妇又紧又深又湿又爽视频| 老校长不戴套玩新婚老师| 欧美性BBBBBXXXXXXX| 亚洲最大天堂无码精品区| 精品久久久久久无码人妻中文| 粗大的内捧猛烈进出| 少妇被躁爽到高潮无码人狍大战| 久久精品中文字幕一区| 爆乳2把你榨干哦ova在线观看| 大黑大巴大战欧洲美女图片| 吉林小伟和杨洋xvideos| 麻豆国产av超爽剧情系列| 国产美女精品视频线免费播放软件| 国产手机在线精品| 久久人午夜亚洲精品无码区| 免费无码av一区二区三区| 野花社区日本在线观看免费观看3| 4438XX亚洲最大五色丁香| 亚va芒果乱码一二三四区别| 久久人人爽人人爽人人片av不| 啊灬啊灬啊快日出水了A片| 丰满人妻被中出中文字幕| csgo未满十八岁能玩多久| 护士趴下光屁股翘臀被打的作文| 日韩毛片人妻久久蜜桃传媒| 被猛男狂cao的体育生| 国产三级无码内射在线看| 一面亲上边一面膜下边的免费| 久久人人爽爽爽人久久久| 欲色av无码一区二区人妻| 欧洲精品一卡2卡三卡4卡影视| 久久精品国产亚洲av麻豆网站| 天天爽夜夜爽夜夜爽|