帶你了解改良土施工的流程
來源:http://www.xintangt.com/ 日期:2025-04-26

改良土施工的時(shí)候準(zhǔn)備活動:在場地規(guī)劃上合理布置石灰或水泥集中堆放場地;消解作業(yè)場地和過篩設(shè)施要合理布置,遵循先消解先使用原則;做好進(jìn)場石灰進(jìn)場試驗(yàn),確保進(jìn)場材料合格。

Preparation activities for soil improvement construction: Reasonably arrange lime or cement storage areas in site planning; The disposal site and screening facilities should be arranged reasonably, following the principle of disposal first, use first; Conduct a lime entry test to ensure that the incoming materials are qualified.

改良土用到的技術(shù)要求:全面開工前,根據(jù)工程土類性質(zhì)和填料性質(zhì)、壓實(shí)機(jī)械條件,分別選擇一定長度的試驗(yàn)區(qū)段進(jìn)行路基填筑試驗(yàn),以選定與路基填筑、壓實(shí)、檢測有關(guān)的工藝參數(shù);改良土配合比等施工工藝參數(shù);確定新的快速試驗(yàn)檢測辦法與已規(guī)定的基本試驗(yàn)檢測之間的相互關(guān)系等,驗(yàn)證和優(yōu)化路基填筑施工作業(yè)指導(dǎo)書,確定施工工藝參數(shù)。

Technical requirements for improving soil: Before the comprehensive commencement of construction, a certain length of test section should be selected for roadbed filling tests based on the properties of the engineering soil and filling materials, as well as the compaction machinery conditions, to select the process parameters related to roadbed filling, compaction, and testing; Improved soil mix ratio and other construction process parameters; Determine the interrelationship between the new rapid testing method and the prescribed basic testing method, verify and optimize the construction operation manual for roadbed filling, and determine the construction process parameters.

試驗(yàn)段的目的是為取得施工經(jīng)驗(yàn)及相關(guān)參數(shù),檢驗(yàn)施工機(jī)械組合,根據(jù)壓實(shí)機(jī)械和路堤不同部位的壓實(shí)標(biāo)準(zhǔn)來確定松鋪厚度、混合料土的最佳含水量、達(dá)到設(shè)計(jì)要求密實(shí)度的碾壓遍數(shù)等,以確定最佳的組合方案。將以上資料整理上報(bào)監(jiān)理工程師批準(zhǔn)后,指導(dǎo)此項(xiàng)工程的路基施工。還有就是要熟悉設(shè)計(jì)圖紙及規(guī)范要求。

The purpose of the experimental section is to obtain construction experience and relevant parameters, test the combination of construction machinery, determine the thickness of loose paving, the optimal moisture content of the mixed soil, and the number of rolling passes to achieve the design required compactness based on the compaction standards of different parts of the compaction machinery and embankment, in order to determine the optimal combination scheme. After organizing and submitting the above information to the supervising engineer for approval, guide the roadbed construction of this project. Also, it is necessary to be familiar with the design drawings and specification requirements.

182ce8e5-e911-4ef4-bc4e-9cbb79446d1a

改良土施工的程序:施工準(zhǔn)備→填筑試驗(yàn)段→確定工藝→驗(yàn)收下承層→測量放樣→集中拌和→運(yùn)輸→填土→攤鋪平整→碾壓→養(yǎng)生→檢驗(yàn)驗(yàn)收

The procedure for improving soil construction: construction preparation → filling test section → determination of process → acceptance of sub layer → measurement and layout → centralized mixing → transportation → filling → paving and leveling → compaction → curing → inspection and acceptance

改良土混合料:采用穩(wěn)定土拌和設(shè)備在拌和廠集中進(jìn)行拌和,同時(shí)配備碎土設(shè)備消除土壤中的土塊。在拌和設(shè)備內(nèi)拌制改良土混合料時(shí),應(yīng)拌和均勻,混合料中不應(yīng)含有大于10mm的土塊和未消解石灰顆粒;并使混合料的組成和含水率(要根據(jù)天氣情況調(diào)整拌和時(shí)的含水率與碾壓時(shí)最佳含水率的關(guān)系)達(dá)到規(guī)定的要求。

Improved soil mixture: Stable soil mixing equipment is used for centralized mixing in the mixing plant, and soil crushing equipment is equipped to eliminate soil lumps in the soil. When mixing improved soil mixture in the mixing equipment, it should be mixed evenly, and the mixture should not contain soil blocks larger than 10mm and undissolved lime particles; And ensure that the composition and moisture content of the mixture (the relationship between the moisture content during mixing and the optimal moisture content during rolling should be adjusted according to weather conditions) meet the specified requirements.

當(dāng)混合料接近最佳含水率時(shí),用重型壓路機(jī)在路基全寬內(nèi)碾壓至要求的壓實(shí)密度,碾壓完成后表面應(yīng)無明顯的碾壓輪痕跡。碾壓時(shí),各區(qū)段交接處應(yīng)相互重疊壓實(shí),縱向搭接長度不小于2.0m,縱向行與行之間的輪跡重疊不小于40cm,上下兩層填筑接頭應(yīng)錯(cuò)開不小于3.0m。兩作業(yè)區(qū)段之間的銜接處縱向搭接拌和長度不小于2.0m。

When the mixture approaches the optimal moisture content, use a heavy-duty roller to compact the entire width of the roadbed to the required compaction density. After compaction, there should be no obvious roller marks on the surface. When rolling, the junctions of each section should overlap and compact with each other, with a longitudinal overlap length of not less than 2.0m. The overlap of wheel tracks between longitudinal rows should not be less than 40cm. The joints between the upper and lower layers of filling should be staggered by not less than 3.0m. The longitudinal overlap mixing length at the junction between two operating sections should not be less than 2.0m.

本文由冷再生機(jī)租賃友情奉獻(xiàn).更多有關(guān)的知識請點(diǎn)擊:http://www.xintangt.com我們將會對您提出的疑問進(jìn)行詳細(xì)的解答,歡迎您登錄網(wǎng)站留言.

This article is a friendly contribution from Cold Recycling Machine Rental For more information, please click: http://www.xintangt.com We will provide detailed answers to your questions. You are welcome to log in to our website and leave a message

  • 上一條:常見的冷再生機(jī)型號介紹
  • 下一條:道路建設(shè)降本增效應(yīng)選擇冷再生機(jī)租賃
  • 免费a级毛片18禁网站免费| 成熟女人毛片www免费版在线| 国产亚洲精品久久久久久久久| gogo西西人体大尺寸大胆高清| 国产精品久久久久久无码| 欧美乱码一二三四区| 人人妻人人澡人人爽欧美一区| 办公室浪荡女秘在线观看| 人妻少妇久久中文字幕一区二区| 奶头被教练摸得受不了| 中文字幕乱码中文乱码51精品| 极品尤物一区二区三区| 性久久久久久| bbox撕裂bass俄罗斯| 国产精品天天看天天做夜夜爽| 亚va芒果乱码一二三四区别| 综合欧美五月丁香五月| 国产熟女老妇300部mp4| 几个东北熟妇的性经历| h双腿涨灌捆绑play慎入| 国产在线拍偷自揄拍无码成人小说| 小荡货奶真大水多好紧视频| 国产特级毛片aaaaaaa高清| 男人多人做人爱的视频| 7777精品伊人久久久大香线蕉| 国产亚洲精品A在线无码麻豆| 妈妈的朋友在线观看| 欧洲老熟妇506070| 大内密探零零性性| 成人漫画网站| 全黄裸片一29分钟免费真人版| 英语课代表的胸软软的| 欧美激情性视频高清在线观看| 88国产精品欧美一区二区三区| 欧美iphonexsmax免费| 成人在色线视频在线观看免费社区| 色妞av永久一区二区国产av| 国产乱妇乱子在线播视频播放网站| 中文字幕无码成人免费视频| 无码国产69精品久久久久APP| 国产美女在线精品免费观看网址|