  舊路面冷再生施工質(zhì)量的控制
  Construction quality control of cold recycling of old pavement
  近幾年來,我國(guó)公路發(fā)展非常迅速,隨著交通量的日益增加,大量公路已接近設(shè)計(jì)使用年限,需要進(jìn)行大修或改造,現(xiàn)場(chǎng)冷再生技術(shù)是適宜的維修或改造方式?,F(xiàn)場(chǎng)冷再生技術(shù),不僅可以節(jié)約能源,降低施工成本,更有益于環(huán)境保護(hù)。結(jié)合改建工程,采用現(xiàn)場(chǎng)冷再生處理舊路面面層及基層,取得良好效果。冷再生基層是指把原路面的舊面層、基層用專用路面再生機(jī),按照一定的厚度進(jìn)行破碎處理,同時(shí)加入一定規(guī)格和數(shù)量的新集料、粘合劑(水泥等),按一定配合比拌和,之后進(jìn)行整形、碾壓,使其恢復(fù)達(dá)到路面基層或底基層技術(shù)要求的施工工藝?,F(xiàn)場(chǎng)冷再生技術(shù),不僅可以節(jié)約能源,降低施工成本,更有益于環(huán)境保護(hù)。下面就于改建工程現(xiàn)場(chǎng)冷再生技術(shù)分析如下:
  In recent years, China's highway development is very rapid, with the increasing traffic volume, a large number of roads are close to the design service life, and need to be overhauled or transformed. The cold regeneration technology on site is the appropriate maintenance or transformation method. On site cold recycling technology can not only save energy, reduce construction cost, but also benefit environmental protection. Combined with the reconstruction project, cold recycling is used to treat the surface and base of old pavement, and good results are achieved. Cold recycled base course refers to the construction technology that the old surface course and base course of the original pavement are crushed with a special pavement regenerator according to a certain thickness, and a certain specification and quantity of new aggregate and binder (cement, etc.) are added, mixed according to a certain mix proportion, and then reshaped and rolled to make it recover to meet the technical requirements of pavement base or subbase. On site cold recycling technology can not only save energy, reduce construction cost, but also benefit environmental protection. The following cold regeneration machine rental on the reconstruction project site cold regeneration technology analysis is as follows:
  1、再生老路概況
  1. Overview of old road regeneration
  改建工程全長(zhǎng)29.374km,其中k0+000-k8+850段進(jìn)行冷再生施工,寬7m。原路面面層為3cm瀝青碎石,基層為15cm石灰穩(wěn)定土,冷再生處理舊路18cm。
  The total length of the reconstruction project is 29.374km, in which the K0 + 000-k8 + 850 section is constructed by cold recycling, with a width of 7m. The surface course of the original pavement is 3cm asphalt macadam, the base course is 15cm lime stabilized soil, and the cold recycling treatment of the old road is 18cm.
               冷再生機(jī)出租
  2、舊路面冷再生施工質(zhì)量控制
  2. Construction quality control of cold recycling of old pavement
  鑒于目前冷再生試驗(yàn)無我國(guó)規(guī)定,本次試驗(yàn)參照《公路土工試驗(yàn)規(guī)程》(JTJ051-93)和《公路工程無機(jī)結(jié)合料穩(wěn)定材料試驗(yàn)規(guī)程》(JTJ057-94)進(jìn)行。
  In view of the fact that there is no national regulation for cold recycling test at present, the test is carried out according to "highway geotechnical test specification" (jtj051-93) and "highway engineering inorganic binder stabilized material test specification" (JTJ057-94).
 ?。?)改建工程冷再生技術(shù)為舊路面面層、基層再生為基層,設(shè)計(jì)強(qiáng)度1.5MPa。通過對(duì)現(xiàn)有材料進(jìn)行分析,采用摻加粘合劑(水泥)的方法,保證基層強(qiáng)度。
  (1) The cold recycling technology of the reconstruction project is that the old pavement surface layer and the base layer are recycled into the base course, and the design strength is 1.5MPa. Through the analysis of the existing materials, the method of adding binder (cement) is adopted to ensure the strength of the base course.
  (2)選擇水泥的摻配比例為百分之3、百分之4、百分之5、百分之6。通過擊實(shí)試驗(yàn)、無側(cè)限抗壓強(qiáng)度試驗(yàn)確定水泥的摻入量。擊實(shí)、無側(cè)限抗壓強(qiáng)度得出試驗(yàn)結(jié)果。
  (2) The mixing proportion of cement is 3%, 4%, 5% and 6%. Through compaction test and unconfined compressive strength test, the amount of cement added is determined. The test results are obtained by compaction and unconfined compressive strength.
  (3)經(jīng)試驗(yàn)室確定冷再生摻加水泥用量百分之5,施工過程中按百分之6控制,進(jìn)行200m試驗(yàn)路段施工,其壓實(shí)度、強(qiáng)度等各項(xiàng)指標(biāo)均達(dá)到設(shè)計(jì)要求。
  (3) According to the laboratory determination, the amount of cement mixed with cold recycling is 5%, and the control rate is 6% in the construction process. The construction of 200m test section is carried out. The compactness, strength and other indicators meet the design requirements.
  • 上一條:水泥撒布車出料不均的處理方法和五大應(yīng)用!
  • 下一條:就地冷再生機(jī),破行業(yè)格局需技術(shù)突破!
  • 久久久久黑人强伦姧人妻| 国产剧情av精品迷奷| 夜里十大禁用短视频软件破解版| julia无码人妻中文字幕在线| 做 ai做的事视频教程| 最近最新高清中文字幕| 亚洲综合色丁香婷婷六月图片| 一个人看的日本hd免费| 国内精品久久久久影院一蜜桃| 金瓶梅1-5电影观看在线| 50岁丰满女人裸体毛茸茸| 久久久久精品国产亚洲av无码| 999国产精品999久久久久久| 被仇人调教成禁脔h虐| 日本爆乳强伦中文字幕电影| 被主人野外调教暴露羞辱历程| 精品久久久久精品亚洲av| 欧美国产成人精品一区二区三区| 国产又色又爽又黄又免费| 亚洲精品深夜av无码一区二区| 日韩在线观看视频| 国产色欲色欲色欲.www| 久久精品亚洲av无码四区毛片| b站直播入口| 少妇被歹徒蹂躏惨叫小说| 欧美又黄又嫩大片a级| 少妇乱子伦精品无码专区| 被多个强壮的黑人灌满精| 亚洲日韩精品一区二区三区| 999久久久国产精品| 中文字幕一区二区三区四区五区| 一边做一边说国语对白| 欧美激情一区二区三区| 久久久久国产精品无套专区| 女人18毛片A级毛片嫰阝| 99久久国产综合精品成人影院| 日本亚欧乱色视频| 伸进内衣揉捏她的乳尖视频| 国产精品人妻久久久久| 欧美黑人乱大交bd| 乳罩脱了喂男人吃奶视频|