冷再生機水穩(wěn)層施工要注意什么?
來源:http://www.xintangt.com/ 日期:2021-08-17
一、施工工藝
1、 Construction technology
1、施工放樣
1. Construction setting out
應(yīng)在施工前做好施工放樣。恢復(fù)中線時,直線段每15~20m設(shè)一樁,曲線段每10~15m設(shè)一樁,并在兩邊路肩邊沿外設(shè)指示樁,在指示樁上用顯著符號標出邊沿的計劃高掛基準線。
Construction setting out shall be done before construction. When restoring the center line, a pile shall be set every 15 ~ 20m in the straight section and every 10 ~ 15m in the curve section, and indicator piles shall be set outside the edge of the shoulders on both sides. The planned high hanging datum line of the edge shall be marked with prominent symbols on the indicator piles.
2、拌和與運送
2. Mixing and transportation
水泥安穩(wěn)碎石底底層選用會合拌制,拌和站設(shè)在百丈互通轉(zhuǎn)盤內(nèi)的空地上。拌和前應(yīng)測定各種規(guī)格的含水量,根據(jù)含水量、天氣情況和運距的長度調(diào)整用水量,保證混合料的含水量均勻、適宜。夏日施工時可先對碎石進行灑水濕潤。含水量要比最好含水量大1.0%,使混合料運到鋪筑地段,攤鋪后在碾壓時的含水量不小于最好值?;覄┝堪凑諛藴室?guī)則的檢測頻率和方法進行,灰劑量缺乏時要及時加灰,保證灰劑量按大于協(xié)作比0.5%控制并符合技術(shù)標準需要,及時取樣進行試件成型
The bottom layer of cement stabilized macadam shall be mixed together, and the mixing station shall be set in the open space in Baizhang interchange turntable. Before mixing, the water content of various specifications shall be measured, and the water consumption shall be adjusted according to the water content, weather conditions and the length of transportation distance to ensure that the water content of the mixture is uniform and appropriate. During construction in summer, the gravel can be watered first. The water content shall be 1.0% higher than the best water content, so that the mixture can be transported to the paving section, and the water content during rolling after paving shall not be less than the best value. The ash dosage shall be carried out according to the detection frequency and method of standard rules. In case of lack of ash dosage, ash shall be added in time to ensure that the ash dosage is controlled by 0.5% greater than the cooperation ratio and meets the needs of technical standards. Samples shall be taken in time for specimen forming
冷再生機出租
3、側(cè)模板
3. Side formwork
在施工水穩(wěn)層前在硬路肩及沒有計劃路緣石的部位先進行側(cè)模板支立,防止水穩(wěn)層澆筑施工時水穩(wěn)層澆筑出計劃邊線。側(cè)模支立時要先進行立模放樣,模板加固后進行校模、驗?zāi)?。供認模板符合計劃需要并經(jīng)監(jiān)理工程師認可,答應(yīng)進行水穩(wěn)層澆筑后方可進行水穩(wěn)層澆筑施工
Before the construction of the water stable layer, the side formwork shall be erected at the hard shoulder and the part without planned kerb to prevent the water stable layer from pouring out of the planned sideline during the pouring construction of the water stable layer. When the side formwork is erected, the formwork setting out shall be carried out first, and the formwork calibration and inspection shall be carried out after the formwork is reinforced. Confirm that the formwork meets the planned needs and is approved by the supervising engineer. The pouring of water stable layer can be carried out only after the pouring of water stable layer is allowed
4、攤鋪
4. Paving
在水穩(wěn)層正式開工之前,應(yīng)在監(jiān)理工程師贊同的地址鋪筑長度為100~200米的試驗路段。在鋪筑試驗路段的過程中,應(yīng)設(shè)專人掛線量測,做好調(diào)查和記載,研討、解決發(fā)現(xiàn)的各種疑問。試驗路段應(yīng)在監(jiān)理工程師的監(jiān)督下進行,假設(shè)試驗路段經(jīng)監(jiān)理工程師贊同查驗,可作為耐久工程的一有些。如試驗段任何有些不合格,則將該有些挖除,再進行試驗段的試驗至抵達復(fù)合需要的標準中止
Before the formal commencement of the water stable layer, the test section with a length of 100 ~ 200m shall be paved at the address approved by the supervising engineer. In the process of paving the test section, special personnel shall be assigned to hang the line for measurement, make investigations and records, discuss and solve various problems found. The test section shall be carried out under the supervision of the supervising engineer. Assuming that the test section is approved and inspected by the supervising engineer, it can be used as part of the durable project. If any part of the test section is unqualified, it shall be excavated, and then the test of the test section shall be carried out until it reaches the standard required for compounding
現(xiàn)場攤鋪選用兩臺攤鋪機階梯式聯(lián)合攤鋪工作,攤鋪機前后相距5~10m,攤鋪速度5km/h。攤鋪過程中應(yīng)根據(jù)拌和才干和運送才干判定攤鋪速度,防止攤鋪機停機待料的情況。設(shè)一個三人小組跟在壓路機后邊, 及時消除粗集料帶或蜂窩,并及時彌補細混合料,攤鋪平整,嚴峻部位挖除后用符合需要的混合料添補,挖除深度不小于
Two pavers shall be selected for on-site paving, with a step-by-step joint paving work. The distance between the front and rear of the paver is 5 ~ 10m, and the paving speed is 5km / h. During paving, the paving speed shall be determined according to the mixing ability and transportation ability to prevent the paver from stopping for material. A three person team shall be set to follow the roller to eliminate the coarse aggregate belt or honeycomb in time, and make up the fine mixture in time. The paving shall be smooth. After the severe parts are excavated, they shall be supplemented with the mixture meeting the needs, and the excavation depth shall not be less than
5、碾壓
5. Rolling
(1)、在攤鋪、修整后立即用壓路機跟在攤鋪機后在全寬范圍內(nèi)進行碾壓。按靜碾-弱振-強震-靜碾的程序進行碾壓施工,碾壓施工過程中壓路機行進速度控制在1.5km/h~3km/h
(1) . immediately after paving and finishing, use the roller to follow the paver and roll within the full width. The rolling construction shall be carried out according to the procedure of static rolling - weak vibration - strong earthquake - Static Rolling. During the rolling construction, the traveling speed of the road roller shall be controlled at 1.5km/h ~ 3km / h
(2)、碾壓程序應(yīng)按試驗路段供認的方法施工。碾壓時,應(yīng)堆疊1/2輪寬,后輪有必要逾越兩段的接縫處。各有些碾壓到的次數(shù)大概相同,兩邊應(yīng)多壓2~3遍。壓實厚度為15cm,壓路機碾壓不到的當?shù)赜萌斯ず粚崱?/div>
(2) . the rolling procedure shall be constructed according to the method admitted by the test section. During rolling, 1 / 2 wheel width shall be stacked, and it is necessary for the rear wheel to exceed the joint of the two sections. Some of them shall be rolled for about the same times, and two or three more times shall be rolled on both sides. The compaction thickness is 15cm. If the roller cannot reach it, it shall be compacted manually.
本文由冷再生機出租整理發(fā)布,您是不是對這些內(nèi)容有所了解了呢?更多的內(nèi)容請點擊:http://www.xintangt.com我們會有更多精彩內(nèi)容等你查看。
This article is published by the rental of cold regenerator. Do you know something about these contents? For more information, please click: http://www.xintangt.com We will have more wonderful content for you to see.
  • 上一條:粉料撒布車與冷再生拌和機的配套使用
  • 下一條:液體撒布車對于融雪的處理
  • 成人奭片免费观看| 印度肥婆丰满bbw| 嗯啊灬别停啊灬用力灬快| 丁香五月亚洲综合深深爱| 毛片24种姿势无遮无拦| 纤夫的爱在线观看完整版动漫| 男生自慰出精gay2022| 喘声2分30秒戴好耳机| 被各种怪物触手h灌满高潮| 老熟女高潮喷水了| 国产乱人伦中文无无码视频试看| 伊人久久大香线蕉影院| 九九久久99综合一区二区| ass美女撒尿pics| 亚洲av无一区二区三区| 永久免费的啪啪免费网址| 免费无码一区二区三区a片百度| 男女无遮挡猛进猛出免费视频| 夜里十大禁用短视频软件破解版| aaa级精品无码久久久国产片| 久久久久久亚洲av无码专区| 被同学玩弄的妩媚mm小说| 免费观看18禁无遮挡真人网站| 她扒下内裤让我爽了一夜a片| 久久久久久久久波多野高潮| 亚洲国产av精品一区二区蜜芽| 欧美喷潮久久久xxxxx| 里番本子侵犯肉全彩A片| 精品乱码一区二区三四区视频| 小悔的性荡生活| 亚洲无线码一区国产欧美国日产| 无码国内精品人妻少妇蜜桃视频| 少妇高潮抽搐无码久久av| 国精产品一品二品国精破解| 爆乳2把你榨干哦ova在线观看| 色综合色综合久久综合频道88| 女人高潮时一吸一夹| yd双性学生授乳荡奶头| 99久久久无码国产精品| 粗大猛烈进出高潮视频免费看| 被多个强壮的黑人灌满浆|