歡迎訪問山東途暢路橋工程有限公司網(wǎng)站!

冷再生機(jī)租賃,水泥撒布車出租

施工租賃熱線

18264104888

您現(xiàn)在所在的位置 :首頁 - 新聞中心 > 行業(yè)資訊
行業(yè)資訊

冷再生機(jī)租賃廠家施工準(zhǔn)備工作
來源:http://www.xintangt.com/ 日期:2022-03-15
冷再生機(jī)租賃廠家在道路施工前要做好充分的準(zhǔn)備工作,才能保障整個(gè)施工過程的順利進(jìn)行,需要做好哪些準(zhǔn)備工作呢?
The leasing manufacturer of cold regenerator should make full preparations before road construction in order to ensure the smooth progress of the whole construction process. What preparations should be made?
1、要建立嚴(yán)謹(jǐn)、規(guī)范的內(nèi)部約束、考核、激勵(lì)機(jī)制,用制度管人,用規(guī)章管理工程。
1. We should establish a rigorous and standardized internal restraint, assessment and incentive mechanism, manage people with systems and manage projects with rules.
2、要補(bǔ)充調(diào)查工程沿線影響施工的因素,標(biāo)注出平面位置圖,并進(jìn)行、論證,寫出調(diào)查報(bào)告,作為修訂施工方案、編制施工控制預(yù)算的依據(jù)。
2. The factors affecting the construction along the project shall be supplemented and investigated, the plane location map shall be marked, and the investigation report shall be prepared and demonstrated as the basis for revising the construction scheme and preparing the construction control budget.
3、施工圖紙,吃透設(shè)計(jì)意圖,澄清圖紙中的問題,恢復(fù)定線和施工放樣。對(duì)所有控制點(diǎn)進(jìn)行加密、保護(hù)、記錄。
3. Construction drawings, understand the design intent, clarify the problems in the drawings, and restore the alignment and construction setting out. Encrypt, protect and record all control points.
4、根據(jù)施工合同協(xié)議和現(xiàn)場(chǎng)調(diào)研認(rèn)真編制施工控制預(yù)算,作為控制支出、進(jìn)行成本預(yù)測(cè)分析、經(jīng)濟(jì)核算以及統(tǒng)計(jì)工程進(jìn)度的依據(jù)。
4. Carefully prepare the construction control budget according to the construction contract agreement and on-site investigation as the basis for controlling expenditure, cost prediction and analysis, economic accounting and statistics of project progress.
冷再生機(jī)出租
Rental of cold regenerator
5、進(jìn)行業(yè)務(wù)、技術(shù)培訓(xùn)和技術(shù)交底,使相關(guān)人員對(duì)工程的技術(shù)標(biāo)準(zhǔn)、操作規(guī)程、質(zhì)量控制、資料整理有全面的了解。
5. Conduct business, technical training and technical disclosure to make relevant personnel have a comprehensive understanding of the technical standards, operating procedures, quality control and data sorting of the project.
6、建立工地試驗(yàn)室,并申請(qǐng)臨時(shí)資質(zhì)。對(duì)施工中擬使用的各種原材料取樣試驗(yàn),建立相關(guān)技術(shù)參數(shù)的數(shù)據(jù)庫。
6. Establish a site laboratory and apply for temporary qualification. Sample and test various raw materials to be used in construction, and establish a database of relevant technical parameters.
7、繪制關(guān)鍵工序施工工藝流程圖和試驗(yàn)操作規(guī)程、質(zhì)量檢查評(píng)定、計(jì)量支付、設(shè)計(jì)變更、事故處理等操作管理框圖,并使圖表上墻。
7. Draw the construction process flow chart of key processes, test operation procedures, quality inspection and evaluation, measurement and payment, design change, accident handling and other operation management block diagrams, and put the charts on the wall.
8、根據(jù)工期要求、技術(shù)標(biāo)準(zhǔn)、機(jī)械設(shè)備能力、材料供應(yīng)、自然條件等進(jìn)行綜合分析,選擇Z佳施工方案,完善施工組織設(shè)計(jì)。
8. According to the construction period requirements, technical standards, mechanical equipment capacity, material supply, natural conditions, etc., conduct comprehensive analysis, select the z-best construction scheme and improve the construction organization design.
  • 上一條:冷再生機(jī)在道路深翻中有什么優(yōu)勢(shì)?
  • 下一條:冷再生機(jī)為何使用那么頻繁?
  • 精品国产三级a在线观看| 暴虐sm灌浣肠调教| 弯腰捡东西突然被进去作文| 好涨嗯太深了嗯啊用力别停| 国内少妇人妻偷人精品免费视频| 亚洲国产精品悠悠久久琪琪| 9制片厂制片传媒在线播放| 鲁一鲁一鲁一鲁一澡| 美女与野兽免费观看| 猛烈顶弄h禁欲医生h怀孕| 嫩草伊人久久精品少妇av| 国产成人18黄网站在线观看软件| 国产成人精品免高潮在线观看| 欧美不卡一区二区三区| 国产精品视频一区二区三区无码| 啊用点力对就是那里视频| 婷婷涩涩五月天综合蜜桃| 亞洲GARY钙片GARY| 中文字幕乱码亚洲∧v日本1| 女人张开腿让男桶喷水高潮| 囯产极品美女高潮无套久久久| 久久亚洲av无码精品色午夜麻豆| AV国产剧情MD精品磨豆| 国产乱人伦精品一区二区| 成熟闷骚女邻居引诱2| 精品一区二区久久久久久久网站| 午夜精品久久久久久毛片| 17岁日本免费完整版观看| 精品国产三级A∨在线欧美| 专干老熟女视频在线观看| 人人妻人人澡人人爽| 我疯狂的挺进老师的身体| 中国体育生gary飞机| 日韩黄色网站| 亚洲AV无码无在线观看| 一个人在线观看的www免费视频| 久久久久久av无码免费网站下载| 国产精品久久欧美久久一区| 免费精品国偷自产在线青年| 丁香色欲久久久久久综合网| 我和两个老师的浮乱生活|