水泥撒布車和冷再生機(jī)在道路施工過程中的應(yīng)用
來源:http://www.xintangt.com/ 日期:2023-04-17
針對(duì)實(shí)際的道路維修,須要水泥撒布車和冷再生機(jī)共同出戰(zhàn)進(jìn)行,大概的修理措施就是先選擇檢驗(yàn)樣本開展抽樣解析,隨后對(duì)須要再造的地面開展就地冷再生檢修,隨后在派撒布車上場灑布水泥。那么其具體施工過程是什么呢?接下來水泥撒布車出租廠家小編就來介紹一下。
For actual road maintenance, cement spreaders and cold recycling machines need to work together. The general repair measure is to first select inspection samples for sampling analysis, then carry out on-site cold recycling maintenance on the ground that needs to be rebuilt, and then dispatch spreaders to sprinkle cement on site. So what is the specific construction process? Next, the editor of the cement spreader rental manufacturer will introduce it.
施工流程
Construction process
1、水泥撒布
1. Cement spreading
依照配比布置的混凝土劑量和再造材質(zhì)的高干密度等數(shù)劇,測算獲得每平米的混凝土凈重,選用水泥自動(dòng)撒布車在地面上均勻?yàn)⒉蓟炷痢?/div>
Calculate the net weight of concrete per square meter based on the dosage of concrete arranged in the ratio and the high dry density of the recycled material. Use a cement automatic spreader to evenly distribute the concrete on the ground.
2、冷再生機(jī)施工
2. Cold regeneration machine construction
對(duì)半幅4.6m地面應(yīng)用WR240開展就地再造,2.4m的銑刨寬度2次工作就可成功半幅施工,WR240再生機(jī)銑刨拌和深度為20cm,行駛速度為7m/min。
On site reconstruction of half 4.6m of ground using WR240 can be successfully carried out with a milling width of 2.4m in two operations. The milling and mixing depth of WR240 recycling machine is 20cm, and the driving speed is 7m/min.
水泥撒布車出租
3、平整和夯實(shí)
3. Leveling and compaction
WR240就地再生結(jié)束后,1臺(tái)26噸單鋼輪壓路機(jī)隨后開展靜壓1遍,隨后平地機(jī)開展平整;接著,26噸單鋼輪壓路機(jī)開展強(qiáng)振夯實(shí)3遍和弱振3遍進(jìn)行復(fù)壓,終使用26噸膠輪壓路機(jī)夯實(shí)5遍成功終壓。
After WR240 local regeneration, a 26 ton single drum roller will be statically pressed once, and then the grader will be leveled; Next, a 26 ton single steel wheel roller was used to carry out strong vibration compaction for 3 times and weak vibration compaction for 3 times for re compaction, and finally, a 26 ton rubber wheel roller was used to compact 5 times successfully for final compaction.
4、遮蓋養(yǎng)生
4. Covering for health preservation
擊實(shí)結(jié)束的道路,馬上應(yīng)用水車勻稱噴撒一遍水,并遮蓋復(fù)合土工膜開展養(yǎng)生7天,養(yǎng)生期內(nèi)上、下午各撒水一次。
After the compaction is completed, the road should be immediately sprayed with water evenly by a water truck, and the composite geomembrane should be covered for 7 days of curing. During the curing period, water should be sprinkled once in the morning and once in the afternoon.
以上就是水泥撒布車和冷再升機(jī)在現(xiàn)實(shí)公路施工中的施工流程內(nèi)容了,在具體運(yùn)用中,更為強(qiáng)大的動(dòng)力,更加節(jié)約了土建工程時(shí)間,提升了施工效率,防止了由于人工操作導(dǎo)致的不良影響危害,同時(shí)很大的節(jié)約了人才資源和時(shí)間,充分確保了全部項(xiàng)目的品質(zhì)。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://www.xintangt.com咨詢了解吧!
The above is the construction process of cement spreaders and cold reheaters in real highway construction. In practical applications, they have more powerful power, save more time in civil engineering, improve construction efficiency, prevent adverse effects and hazards caused by manual operation, and greatly save talent resources and time, fully ensuring the quality of all projects. For more related content, come to our website http://www.xintangt.com Consult and understand!
  • 上一條:冷再生機(jī)如何進(jìn)行銑刨及拌和的工作?
  • 下一條:冷再生機(jī)銑刨施工工藝先進(jìn)性的表現(xiàn)
  • 高冷男总裁憋尿被揉下面| 日本丰满bbwbbw| 国产精品扒开腿做爽爽爽视频| 奴役 支配 性狂虐 电击 极端| 伊人久久大香线蕉AV色| 久久久久精品国产亚洲av无码| 他底下好硬蹭着我想要| 国产色综合天天综合网| 把腿扒开做爽爽视频| 国产成人18黄网站在线观看软件| 淑芬又痒了把腿张开在线视频| 亚洲欧美色一区二区三区| 丰腴妖艳饥渴50岁岳| a级黄肉小说大杂交| 99麻豆久久久国产精品免费| 高清dvd碟片 播放| 清纯校花自慰呻吟流白浆| 日本一区二区三区视频| 欧美精品一区二区三区在线观看| 青青青国产精品一区二区| 声声奶酥1v办公室| 麻豆国产一区二区三区四区| 亚洲欧洲精品成人久久曰影片| 成人家庭影院| 日本少妇做爰全过程毛片| 教官脔到她哭h粗话h好爽视频| 欧美性生交xxxxx久久久| 毛很浓密超多黑毛| 京东一热本色道久久爱| 乱lun合集1第40部分阅读| 和山田进行lv999的恋爱| 青青草在线视频| 无码人妻久久一区二区三区免费丨| 天天影视色香欲综合久久| 办公室里呻吟的丰满老师电影| 啊┅┅快┅┅用力啊岳| 又粗又大又爽真舒服| 国产69久久精品成人看| 日本gay视频japan| 全部删除看过的历史记录| 被别人巨茎征服的娇妻3d动漫|