歡迎訪問山東途暢路橋工程有限公司網(wǎng)站!

冷再生機(jī)租賃,水泥撒布車出租

施工租賃熱線

18264104888

您現(xiàn)在所在的位置 :首頁 - 新聞中心 > 公司新聞
公司新聞

冷再生機(jī)租賃對瀝青路面改造的配置要求?
來源:http://www.xintangt.com/ 日期:2020-10-14
  十幾年前在道路施工時(shí),需要將舊的瀝青路面鏟除,造成了很大的浪費(fèi),而現(xiàn)在冷再生機(jī)出現(xiàn) ,可以減少浪費(fèi)。冷再生機(jī)是指瀝青路面就地冷再生是利用一體化的再生設(shè)備、添加材料、一 次拌和成型工藝,通過新鋪結(jié)構(gòu)面層,構(gòu)成舊路面改造新的一套完整體系。下面冷再生機(jī)租賃廠家就來講解一下關(guān)于對瀝青路面改造的配置要求和準(zhǔn)備工作。
  More than ten years ago, in the road construction, the old asphalt pavement needs to be removed, resulting in a lot of waste, but now the emergence of cold recycling machine, can reduce waste. Cold recycling machine refers to the cold in place recycling of asphalt pavement, which is a complete set of new system of old pavement reconstruction by using the integrated recycling equipment, adding materials and one-time mixing molding process through the new pavement structure. The following cold recycling machine rental manufacturers will explain the configuration requirements and preparations for asphalt pavement reconstruction.
  準(zhǔn)備工作:
  preparation:
  再生前的各項(xiàng)準(zhǔn)備工作在施工前到位,確保工期正常進(jìn)行。主要內(nèi)容包括:人員準(zhǔn)備、機(jī) 械準(zhǔn)備、材料準(zhǔn)備、交通協(xié)調(diào)及后勤保障。
  All preparations before regeneration shall be in place before construction to ensure normal construction period. The main contents include: Personnel Preparation, mechanical preparation, material preparation, traffic coordination and logistics support.
                    冷再生機(jī)租賃
  材料要求:
  Material requirements:
  水泥選用強(qiáng)度等級為32.5、初凝時(shí)間≥3h、終凝時(shí)間≤10h且≥6h硅酸鹽或普通硅酸鹽水泥 。水泥應(yīng)具有良好的工作性、低水化、高后期強(qiáng)度、耐久性、耐腐蝕性和抗裂性能。
  Portland or ordinary portland cement with strength grade of 32.5, initial setting time ≥ 3h, final setting time ≤ 10h and ≥ 6h. Cement should have good workability, low hydration, high late strength, durability, corrosion resistance and crack resistance.
  機(jī)械要求:
  Mechanical requirements:
  工程施工過程通過再生機(jī)組來完成,再生機(jī)組包括:冷再生主機(jī)、水泥稀漿車、平地機(jī)、 壓路機(jī)等。
  The construction process of the project is completed by regeneration unit, which includes: Cold Recycling host, cement slurry truck, grader, roller, etc.
  人員要求:
  Personnel requirements:
  工程技術(shù)人員及機(jī)械操作人員應(yīng)經(jīng)過冷再生培訓(xùn)并經(jīng)過考核合格后方可上崗。
  Engineering and technical personnel and mechanical operators shall receive cold regeneration training and pass the examination before taking up their posts.
  工程協(xié)調(diào):
  Project coordination:
  作好施工總體計(jì)劃,采取不中斷交通半幅施工,作好施工期間交通疏導(dǎo)工作,準(zhǔn)備施工作 業(yè)面的遮擋。
  The overall construction plan shall be made, the half width construction without interruption of traffic shall be adopted, the traffic dredging work during the construction period shall be well done, and the shelter of the construction working surface shall be prepared.
  以上是關(guān)于冷再生機(jī)對瀝青路面改造的配置要求的介紹,相信大家都有所了解了,如想了解更多內(nèi)容歡迎點(diǎn)擊我們的http://www.xintangt.com網(wǎng)站。
  The above is about the configuration requirements of cold recycling machine for asphalt pavement reconstruction. I believe you all know something about it. If you want to know more, please click our http://www.xintangt.com Website.
  • 上一條:水泥撒布車的使用率如何提高?
  • 下一條:冷再生泡沫瀝青冷再生機(jī)出租施工的技術(shù)有哪些?
  • 中文字幕有码无码人妻AV蜜桃| 最近高清无吗免费看| 免费无码又爽又刺激高潮的app| aaaaa级少妇高潮大片免费看| 丁香色欲久久久久久综合网| 国产麻豆成人精品av| 欧美日激情日韩精品嗯| 高h小月被几个老头调教| 国内女人喷潮完整视频| 午夜性爽视频男人的天堂| 暴虐sm灌浣肠调教| 白嫩少妇bbw撒尿视频| 国产又色又爽又黄的免费| 肥妇大bbwbbwbbwbbwbbwbbw| 亚洲国产三级在线观看| 久久亚洲精品中文字幕| 玩弄japan白嫩少妇hd小说| 最近韩国电影高清免费观看hd| 男人喜欢水多还是夹得紧的| 一本久道中文无码字幕av| 无需付费看美女直播的软件| 男人亚洲成色av网站| ass大胆孕妇分娩pics| 亚洲精品无码高潮喷水在线| 最近2019中文字幕大全视频1| 囯产极品美女高潮无套久久久| 少妇被粗大猛进进出出s小说| 无码日韩人妻AV一区二区三区| 成人午夜亚洲精品无码网站| fuck chinese 沈阳熟女| 3dmax动漫 在线观看| sm调教论坛一区| 女人与公拘交酡免费网站| 亚洲第一成人网站| AV无码小缝喷白浆在线观看| 人狗胶配方大全免费| 日本高清色www在线观看视频| 狠狠躁夜夜躁人爽碰| 少妇又紧又深又湿又爽视频| 精品无码人妻一区二区三区18| 国产一区二区三区小说|