歡迎訪問山東途暢路橋工程有限公司網(wǎng)站!

冷再生機(jī)租賃,水泥撒布車出租

施工租賃熱線

18264104888

您現(xiàn)在所在的位置 :首頁 - 新聞中心 > 公司新聞
公司新聞

冷再生泡沫瀝青冷再生機(jī)出租施工的技術(shù)有哪些?
來源:http://www.xintangt.com/ 日期:2020-10-19
  瀝青冷再生技術(shù),其實(shí)就是將泡沫瀝青的一些優(yōu)良性能應(yīng)用于實(shí)際應(yīng)用的技術(shù)。與傳統(tǒng)工藝相比,在實(shí)際應(yīng)用中效果較好。但是,用戶要想充分發(fā)揮技術(shù)優(yōu)勢(shì),在實(shí)際施工過程中需要遵循以下流程:
  The cold recycling technology of asphalt is actually a technology that applies some good properties of foamed asphalt to practical application. Compared with the traditional process, the effect is better in practical application. However, in the actual construction process, users need to follow the following technical advantages:
  在施工過程中,冷再生租賃過來以后,首先需要用銑刨機(jī)將要進(jìn)行鋪設(shè)的瀝青面層清洗干凈。需要大修的路面要磨平到基層。廢料可由裝車車重新裝車回用,然后鋪設(shè)泡沫瀝青混凝土。需要注意的是,這些冷再生技術(shù)在鋪筑新路面過程中不受天氣條件的限制,即使在寒冷的天氣和雨天,仍能進(jìn)行施工。單從這點(diǎn)就可以看出,它在當(dāng)今市場上的應(yīng)用非常廣泛。
  In the construction process, after the cold recycling lease, the asphalt surface course to be paved shall be cleaned with a milling machine. The pavement to be overhauled shall be ground to the base. The waste can be reloaded by the loading car, and then the foamed asphalt concrete will be laid. It should be noted that these cold recycling technologies are not limited by the weather conditions in the process of paving new pavement, even in cold weather and rainy days, construction can still be carried out. From this point we can see that it is widely used in today's market.
  以上是泡沫瀝青在施工過程中的冷再生工藝流程。只要用戶按照上述工藝進(jìn)行路面攤鋪,那么它的效果必然就是有保證的。
  The above is the cold recycling process of foamed asphalt in construction. As long as the user carries on the pavement paving according to the above technology, then its effect must be guaranteed.
                 冷再生機(jī)出租
  在實(shí)施一個(gè)項(xiàng)目時(shí),需要進(jìn)行質(zhì)量控制,以確保效果。那么,如何控制冷再生的質(zhì)量呢?為保證冷再生租賃的質(zhì)量控制,應(yīng)遵循以下三點(diǎn):
  In the implementation of a project, quality control is needed to ensure the effect. Then, how to control the quality of cold regeneration? In order to ensure the quality control of cold regeneration leasing, the following three points should be followed:
  1、原材料的各項(xiàng)試驗(yàn)要在施工前進(jìn)行,檢驗(yàn)合格后方可使用。施工前應(yīng)對(duì)混合料進(jìn)行各種試驗(yàn),確認(rèn)材料無變化后方可施工。
  1. All tests of raw materials should be carried out before construction and can be used only after passing the inspection. Before construction, all kinds of tests should be carried out on the mixture, and the construction can be carried out after confirming that the materials have no change.
  2、施工過程中,應(yīng)隨時(shí)檢測混合料中粘結(jié)劑和外加劑的含量,確保施工質(zhì)量。
  2. During the construction process, the content of binder and admixture in the mixture should be detected at any time to ensure the construction quality.
  3、在施工過程中,應(yīng)根據(jù)混合料的拌和性和可加工性及時(shí)調(diào)整耗水量。
  3. In the construction process, the water consumption should be adjusted timely according to the mixing and processability of the mixture.
  以上是關(guān)于冷再生泡沫瀝青冷再生機(jī)施工的技術(shù)的介紹,希望對(duì)大家有所幫助,如想了解更多內(nèi)容請(qǐng)多多關(guān)注我們的網(wǎng)站。
  The above is about cold recycling foam asphalt cold recycling machine construction technology, hope to help everyone, if you want to know more content, please pay more attention to our website.
  • 上一條:冷再生機(jī)租賃對(duì)瀝青路面改造的配置要求?
  • 下一條:瀝青撒布車普通型,標(biāo)準(zhǔn)型,智能型的區(qū)別!
  • 无码A级毛片免费视频内谢5J| (无码视频)在线观看| 国产免费又色又爽粗视频| 久久久久久国产精品免费免费男同| 国产丰满老熟女重口对白| 人人爽人人爽人人爽| 回民丰满少妇xxx性| 露脸叫床粗话东北少妇| 国产精品毛片大码女人| 宝贝腿开大点我添添公交车| 公交车上荫蒂添的好舒服视频| 成人国产片女人爽到高潮网站| 日韩精品久久无码中文字幕| 欧美肉大捧一进一出免费视频| 啊灬啊灬快灬高潮了视频| 日本乱偷人妻中文字幕在线| 图书馆h含着粉嫩小奶头h漫画| 娇小性xxxx摘花hd| 精品国产成人亚洲午夜福利| chinese性老妇老女人| 老公一到晚上就日不停| 97久久国产亚洲精品超碰热| 野花高清完整版免费观看视频大全| 日产a一a区二区| 太深太粗太爽太猛了视频免费观看| 青苹果乐园全网影视大全| 99这里只有精品| 伸进同桌奶罩里摸她胸作文| 人妻少妇精品中文字幕av| 可播放的男gary| 激情综合一区二区三区| 欧美牲交a欧牲交aⅴ久久| 亚洲av永久无码精品水牛影视| 欧美熟妇另娄久久久久久| 蜜臀av色欲a片无码精品一区| 亚洲中文字幕无码自拍一拍五月| 亚洲av无码潮喷在线观看| 男男野外做爰全过程69| 精品国产亚洲av麻豆| 久久人人爽人人爽人人av东京热| 少妇aaa级久久久无码精品片|